|
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] FCIP: SycnhronizationIt is very difficult to write meaningful black box synchronization tests for FCIP as currently defined. It also causes a window of confusion if there are protocol errors in the PDU. I would like to propose the following definition for synchronization, which I suspect was probably a starting point, in order to understand why we have the current multi-option set of tests : Test to be used to verify PDU synchronization within TCP stream: Synchronization is defined by a valid length field (as currently defined) that points to a valid EOF delimiter. The FCIP entity enters the loss of synchronization state either at the start of the PDU or at the end of the PDU. One issue here may be that this requires the FC entity to be able to transmit the frame on the Fibre Channel interface with a EOF indicating an error. Barry Reinhold Principal Architect Trebia Networks barry.reinhold@trebia.com 603-868-5144/603-659-0885/978-929-0830 x138
Home Last updated: Thu Sep 20 14:17:17 2001 6633 messages in chronological order |