|
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index] iscsi : Data ACKs already been included into draft (?)Julian & All, It looks like the Data ACK scheme you proposed has already been included into the Rev 7.97 draft !(?) I don't recollect the group having reached consensus on re-inclusion of this feature, nor consensus on the mechanism used for the data ack. Given this, why is the change already present in the draft ? I would like to request that any changes to the draft be first posted to the reflector for review and only upon its acceptance on the reflector should it be included in the draft. Incorporating changes into the draft prior to their acceptance on the reflector is only going to slow down the stabilization of the draft further. At this late stage in the draft, every sentence modified must be subject to review prior to inclusion in the draft. Thanks, Santosh -- ################################# Santosh Rao Software Design Engineer, HP, Cupertino. email : santoshr@cup.hp.com Phone : 408-447-3751 #################################
Home Last updated: Wed Sep 26 16:17:18 2001 6773 messages in chronological order |